High Voltage Inverter series resonance technology research



2 System structure and working principle

Figure 1 shows a block diagram of the high voltage series resonant power supply system. The power supply for the material surface treatment equipment developed. It includes: three-phase AC / DC converter, voltage-bridge series resonant inverter, super audio step-up transformer and the load. Super audio transformer for load impedance power inverter with charger IGBT modules used, the operating frequency is about 20kHz. System work, showing little emotional, zero current conduction. For inductive loads, in a work cycle, the order of the power device is a diode conduction earlier, IGBT in the post, which ensures zero current conditions in IGBT conduction (ZCSON), conduction velocity after being resonant circuit current rise constraints, therefore, IGBT turn-on loss is small. Also shown in Figure 2, IGBT snubber capacitor Cr1 and Cr2 access, limiting the IGBT turn-off rate of voltage rise, reducing the turn-off losses.

High series resonant power supply system diagram

The use of load resonant RLC series resonant circuit whose resonant frequency is

The use of load resonant RLC series resonant circuit whose resonant frequency is

Inverter main circuit and the impedance characteristic shown in Figure 2. Inverter output is high frequency square wave, the transformer leakage inductance and capacitive load resonance, close to the ideal sinusoidal current waveform.

Shown in Figure 2 for the resonant circuit, the quality factor

Resonant circuit quality factor

| UL | = | UC | = QUo (3)

The voltage step-up transformer output after the resonance voltage reaches 10 ~ 30kV, load discharge phenomenon occurs, or the treatment material for generating ozone.

RLC series resonant
           (A) the inverter main circuit (b) Impedance
Figure 2 RLC series resonance

3 Control Circuit

The method used to adjust the output power of a controlled rectifier voltage regulation power, chopper power, phase transfer function or PWM function. This design uses three-phase phase-controlled rectifier power supply technology to achieve through the phase-controlled rectifier output power adjustment. Although this method is under control in the deep disadvantage of low output power factor, but its control methods mature, high reliability, for most of the work at full power output (α = 0) case, after all, a good choice . A half-bridge inverter circuit, which is in the full-bridge inverter output voltage of the DC component contained in the high frequency high voltage booster designed to take into account the DC TO AC magnetic flux may cause the problem of saturation magnetic flux, and it will increased core loss, increasing the difficulty of transformer design. Although you can output blocking capacitors in series to avoid this problem, but adds cost and complexity.

Inverter control block diagram shown in Figure 3. Load equivalent to a nonlinear lossy capacitor, in the case of high power output load of work in the vicinity of the resonance, the experimental results, the load in the course of discharge spark enhanced resonance frequency drops, never started discharging down to around 30kHz 15kHz. If you do not use frequency tracking, unable to meet the high power output. Used in the inverter control circuit CD4046 PLL, the current phase as measured by the transformer, the monostable circuit (interference) is taken directly from the control circuit after the output voltage signal for the edge of the phase. 4046 has two internal phase, a first phase is XOR phase detector, it is only the duty cycle of 0.5 to two square wave phase, and phase characteristic curve is not monotonic, the working must be the first one signal phase-shifted by 90 ° in order to work properly. Therefore, using the edge of the phase, it can not consider the pulse width, pulse rise concerned only, shown in Figure 4, the end edge of the signal 1, the time difference is zero pulse.

2013年6月8日星期六

Also is the way to business alliance or capital operation, quickly open the domestic market


Swim always stressed that the dc to ac converter companies into the domestic market, channel, product transformation is the key.

Export-oriented photovoltaic enterprises with advanced technology and excellent product quality, combined with the advantages of internationalized vision, find the combining site of domestic power market demand with the enterprise itself resources, produces meet the demand of domestic power plant owner products, develop new channels, in order to "turn" in the domestic market, not only can find the "winter" cotton-padded clothes, also make contributions to promote domestic demand.

Sure.

For a large number of small and medium-sized pv enterprises, shifted threshold is one of the most direct and the most sad: professional talents.

To swim, specializing in the power station project manager of such human force resource is very shortage in domestic.

The experienced personnel general salary is very high. Even if is to cultivate such a project manager, also need to take 3 to 5 years time.

But the human factor at the same time, the natural environment and price competition also overlay the pv companies intothe domestic market pressures.

Do in domestic is relatively complex, the roof project considering state; Do mountain station, safety factors and lighting design is reasonable, etc.

So the design and construction is a difficulty of the construction of the power station in our country.

Second is the price competition between domestic enterprises is very prominent, the overall quality control analysis of the lack of professional company, has been "professional companies don't get project, not professional company continues to make power station" problem of low price competition, the last is the result of the power quality is no good.

2013年5月28日星期二

The current domestic production of photovoltaic power station under the condition


The same scale and lighting grid tie inverter lower than that in foreign nations by 20% ~ 30%, with the equipment, technology innovation, design, construction level and intelligent control is inseparable.

In front of the power station construction, to this end, the future enterprises shall be carried out in terms of location, choice of technology route detailed argumentation, find the most suitable plan to build power stations; In the process of power plant construction, should guarantee the quality at the same time the cost savings as far as possible; After completion of power plant construction, to maintenance scientifically, to ensure that the power plant generating capacity.

In addition, countries should formulate a set of standard of power plant, in line with international standards for power station related equipment such as components, stents, inverter, junction box, reactive power compensation device, etc.

Set reasonable standards, in order to ensure the service life of power station and operating efficiency is not lower than the international standard.

Only in this way, makes our country is not only a DC TO AC products manufacturer, has become a pv power plant installation and application of power.

Photovoltaic (pv) home everything owe to guide
Reporter: "solar power development" twelfth five-year "plan" to national pv capacity target, continuously rise, for distributed generation and SGC is issued at the end of February by regarding the distributed power grid service work opinion ".

Shanghai, Qingdao, Beijing and other places have personal family rooftop photovoltaic power station connected to the electricity grid and smooth running success.

Interconnection bottleneck has been breakthrough, but the photovoltaic power generation system display to electrical hypermarket, easily installed on the roof of the ordinary people, this a moment how far is it from us?

JinBaoFang: from Europe and the United States and other developed countries, the development of photovoltaic products in almost greatly save fossil fuels, to reduce pollution, protect the environment has made important contributions.

Before, China's photovoltaic industry is known as the "two head out", namely raw materials and products sales abroad.

With the development of recent years, this situation is undergoing tremendous changes.

At present, China's pv manufacturing capacity has reached 40 gigawatts (gw), the world's first.

Our country has become a pv production country, technology continues to progress, photovoltaic products prices are lower, in the domestic large-scale popularization and application of the conditions are ripe.