As the largest domestic
solar power inverter
construction of private enterprises, chint has built 750 mw solar power inverter and solar power inverter project under construction, which has
been connected to the grid in the power station more than half.
This year the new 300 mw power plant,
mostly has also got the project.
Hui revenge show that, due to the European
"double reverse" the conclusion is not yet clear, the domestic
power
converter
supporting policy pending, power converter this
year if I can walk out of the "trough" is hard to say.
But don't panic "bread" has
heart, depends on the power converter smoothly, revenge show Hui to fulfill the
sales task group issued 5.5 billion yuan this year was "very
confident", compared with last year, that number increased by 12.2%.
"In addition to actively participate
in the power converter in zhejiang province" five one
"comprehensive innovation pilot work, this year we will strengthen and
foster, curtain, etc.
Other advantages in the field of enterprise
cooperation in the industrial chain division of labor."
Revenge show Hui said, and "win-win
co-operation" of the enterprise, is to chint
inverter with charger
cost
is further reduced.
But problem also subsequently and come.
German photovoltaic inverter with charger is
given priority to with access to distribution network, distribution and scale
is larger, caused great influence to the safe and stable operation of inverter with charger network, noon peak distribution network congestion phenomenon is
very serious, acceptance of distributed inverter with charger
capacity is insufficient, the distribution network has become a German photovoltaic
industry development the important restriction factor.
As a
result, Germany in 2009 began to cut subsidies for solar power inverter.
没有评论:
发表评论