Electricity online" mode, the
power inverter
absorb solar energy into direct current, then through the inverter to
convert alternating current (ac), an alternating current through the wires
connected to the meter measuring photovoltaic power generation and power users,
respectively, a user via a computer link to special operating software, you can
see the corresponding data.
In on the roof of the solar water heater,
photovoltaic panels of the house of Mr. Zhao is particularly conspicuous, Mr
Zhao, the pv systems with a total investment of 30000 yuan, mainly for the
installation design, free access to grid power company.
Tongling belong to the state three types of
illumination area, according to tongling illumination time is about 1500 hours
per year, a year come down, the
power converter
system capacity of more than 4000 degrees, can
be reduced at least about 3000 kg of carbon dioxide emissions.
Small test pass environmental positive
energy
Mr. Zhao's work has nothing to do with the
energy industry, but he want try on their own, their own benefit at the same
time do for environmental protection efforts, to drive more people to use clean
energy around you.
According to zhao peng, in Europe,
Australia, family use photovoltaic power generation, especially used on villa
has been quite common.
Last October, the national
PV inverter
has
released on the distributed grid-connected photovoltaic (pv) service work
opinion ", scattered distributed photovoltaic connected to low voltage
distribution network, allow the surplus electricity to the Internet, according
to the national policy for full purchase surplus power grid enterprises.
The good news to let laozhao stirring.
"This is equivalent to civil grid-connected photovoltaic (pv) opened the
door, I just want to do a small test at home."
Lao zhao first consulting many technology
companies and tongling power supply company.
Because is the first door, tongling
tongling power supply company has opened up a green channel, tongling power
supply company accepts the Mr. Zhao's application in early April, the second
day is the door to check, is responsible for the installation of the new
company to submit the construction scheme, and assign a quality approach.
没有评论:
发表评论