Recently from 900 million for large power
station in western China, let its shares rise rapidly.
A pv inverter manufacturers also tells a
reporter: "for the entire system, solar silicon solar energy components
account for 60% of the cost, but 40% of the cost also includes other appliances
and install the product inside.
Although the crystal silicon batteries
appeared a serious surplus, but the inverter and other
power converter
need
electrical equipment condition is much better, even while maintaining a certain
growth market demand.
Especially in the field of distributed
photovoltaic market is about to start, the core parts such as the micro
inverter in the Chinese market is basically blank."
So, expand the train of thought, do the
industry chain long, photovoltaic excess capacity is also cracked a dose of
medicine.
Path: centralization and distribution of
construction is better
Start the domestic market all have no
objection, split on whether, like the wind, take big base construction mode, or
like Europe and the United States, families distributed construction mode.
Concentration is can quickly do the
benefits of the construction of the large market, the rapid easing overcapacity
is undoubtedly the most effective.
Moreover, the construction train of thought
on the construction of wind power has let us see the
dc to ac inverter
.
However, centralization is power out of the
side effects of the difficult.
Wind power base of the construction of the
sequela is today's large wind.
Therefore oppose opinion, if the
photovoltaic continue to wind path, today's overcapacity may defuse
temporarily, but in the future if there is "discard", not necessarily
on the sustainable development of the whole photovoltaic industry.
没有评论:
发表评论